SFU Stadium

SFU Stadium

The new 1,800-seat stadium at Simon Fraser University is home to the SFU Athletics Team and a new facility for community and student events. The crowning piece of the design is a striking CLT canopy which cantilevers 16 metres, providing weather protection…

Barnard Substation Upgrade

Barnard Substation Upgrade

Barnard substation was built in 1950/60’s and needed investment to meet energy demands of next 20 years and improve safety of workers and public. This project was more complex than normal because we encountered a number of significant challenges. Given the age of the facility…

Canal Lachine Bridge

Canal Lachine Bridge

The Canal Lachine Bridge is a signature, curved, cable stayed bridge in downtown MontrĂ©al, QuĂ©bec as part of the $1.5 billion Design-Build Turcot Project. The 350-m long structure uses an innovative, highly redundant composite steel grillage system…

Fast + Epp Home Office

Fast + Epp Home Office

Fast+Epp’s 4-storey home office building embraces design elegance and curiosity. The building uses hybrid mass timber and steel as the structure’s fundamental building block to demonstrate material efficiency, cost-effectiveness, and sustainable construction. The space on the ground…

Gellatly Road Bridge Replacement

Gellatly Road Bridge Replacement

The new bridge and roadway provides an aesthetically-pleasing, more-resilient bridge that will mitigate impact from future flooding to Powers Creek, adjacent properties, and local accesses. Fast track construction was facilitated in off peak months and in two separate…

Williams Lake Net Zero Energy Building

Williams Lake Net Zero Energy Building

The 1,500m2 MCFD retrofit project in Williams Lake is BC’s first pilot project to trial the design and construction of a ground-breaking Net Zero Energy building. TWD and Energy Revolution Services worked with Thibodeau Architecture + Design and the client to develop…

Highline Metrotown

Highline Metrotown

Horizon Engineering is proud to be a part of the design build team that brought this geotechnically complex and world class development to fruition. Horizon’s collaboration with the project team resulted in innovative geotechnical design solutions which allowed…

Compass Implementation on HandyDART

Compass Implementation on HandyDART

Binnie was engaged by TransLink to manage the implementation of Compass— TransLink’s contactless fare collection system—on HandyDART. This project involved significant engagement and communications efforts, installing equipment on the buses, developing and implementing a technical solution…

H-Frame Elimination Program

H-Frame Elimination Program

The H-Frame removal project consisted of BC Hydro removing over 350 H-Frame wooden poles with overhead wires and electrical equipment from Downtown Vancouver to improve reliability and safety concerns. The H-Frames are replaced with underground services in easy-access vaults…

Minton Lake Dam Rehabilitation

Minton Lake Dam Rehabilitation

The original water level was maintained following the construction which allowed local use and land impoundment to be maintained. It meets the latest dam safety guidelines and is designed to safely pass water during the design flood without manual gate operation. The removal of the manual gate…