The Queensborough substation is supplied by the BC Hydro 69kV Transmission system. The substation is a greenfield fenced site and serves as the third substation in the City’s service area. This new substation will alleviate a distribution backup requirement. It will also provide backup for the existing…
Barnard Substation Upgrade
Barnard substation was built in 1950/60’s and needed investment to meet energy demands of next 20 years and improve safety of workers and public. This project was more complex than normal because we encountered a number of significant challenges. Given the age of the facility…
Kanaka Creek Bridge Seismic Retrofit
The Kanaka Creek is designated as a Major Route structure and forms part of the BCMoTI’s critical route in response to a disaster. There are five lanes of traffic, two northbound lanes to Maple Ridge and three southbound lanes to Albion…
New Bridge for the Saint Lawrence Corridor Project
SNC-Lavalin
The new Champlain Bridge over the St. Lawrence River comprises 2044 m long west approach, a 528 m long cable-stayed section and 762 m long east approach. The Signature on the Saint-Lawrence Group (SSLC)…
Qualicum Beach Waterfront – Beach Creek Estuary Enhancement
SNC-Lavalin
The Town of Qualicum Beach has developed a comprehensive Waterfront Master Plan (WMP) that will help the town achieve a long-term goal of environmental, economic, social, and cultural sustainability…
BCRTC Vehicle Storage Facility Expansion – OMC 3A Project
SNC-Lavalin
As part of the Evergreen Extension completed in 2016, SNC-Lavalin designed and built the existing Vehicle Storage Facility (VSF) in Coquitlam, British Columbia. To assist our client, TransLink, to meet its objectives to address the…