Seaspan Vancouver Shipyards Outfitting Pier – Design, Permitting & Implementation
SkyTrain OMC1 – Vehicle Maintenance Shop 3 (VMS3)
Polson Park Vernon Creek Naturalization
Highway 97 North Beach Slide
On August 28, 2023, a significant rockfall event occurred on Highway 97 between Summerland and Peachland, covering three out of the four travel lanes with approximately 3,000 cubic meters of rock.
Trans Mountain Expansion Project
Collaboration was the guiding principle for BGC, Stantec, Thurber and WSP to work side-by-side to help design and construct one of Canada’s largest pipeline projects, the Trans Mountain Expansion Project resulting in efficiency and innovation.
Penticton Creek Restoration Phase 3A Upper and 3B
Stantec designed the restoration of 320-metres of Penticton Creek to create a quality fish habitat while providing flood resiliency. The restoration also supports vital ecosystem functions and provides the community with an attractive outdoor space.
Burnaby Firehalls No. 4 & No. 8
The City of Burnaby replaced Fire Hall No.4 and built Fire Hall No.8 to serve SFU and Burnaby Mountain. Both 15,000 sq ft facilities feature sustainable designs, high seismic safety standards, and energy-efficient systems. Fire Hall No.4…
Elk Valley Resources Administration & Maintenance Complex
The existing Admin & Maintenance Complex (AMC) for Elk Valley Resources coal mine near Sparwood, BC, was nearing its end of life, which led to the design and construction of new buildings that would not only upgrade the mine’s operation’s…
Chilliwack WWTP Outfall Rehabilitation Project
The City of Chilliwack’s WWTP Engineering Services needed to rehabilitate the WWTP’s effluent outfall pipe and diffuser. In February 2021, a survey revealed 170 meters of pipe had been undermined by scour associated with Fraser River flows.
CəX̣ ʷ Cixʷ Bridge at Falls Creek
Hwy 1 at Falls Creek was damaged by floods. The Falls Creek Alliance (MOTT, Eurovia/BA Blacktop, Stantec) designed and built a single-span bridge, reopening the Hwy quickly, under budget, ahead of schedule, and with great Indigenous engagement.
LNG Canada Material Offloading Facility
The $96M, 550m long LNG Canada Material Offloading Facility wharf enables Canada’s largest private capital investment project and largest LNG export facility by receiving construction materials and 8,000 tonne plant modules.
Golden Ears Pump Station and Sanitary Sewer Overflow Tank
Adorned with vertical façade panels, Indigenous artwork, advanced exterior LED lighting system, and a green roof, the Golden Ears Pump Station and SSO tank meets its functional objectives of mitigating wet weather impacts to the sewer system.