Jacobs’ New Westminster Interceptor Columbia Section Rehabilitation project is the longest and largest-diameter instance of live sliplining completed in the Lower Mainland and for Metro Vancouver.
The Awards for Engineering Excellence demonstrate the value ACEC-BC member firms offer to clients as they celebrate technical excellence and recognize innovation in consulting engineering that is simply a cut above the rest.
Golden Ears Pump Station and Sanitary Sewer Overflow Tank
Adorned with vertical façade panels, Indigenous artwork, advanced exterior LED lighting system, and a green roof, the Golden Ears Pump Station and SSO tank meets its functional objectives of mitigating wet weather impacts to the sewer system.
North Surrey Interceptor No. 2 – Preliminary Design
GHD designed 830m long 2.7m diameter tunnel with a 2.4m x 2.4m box culvert supported on piles for Metro Vancouver, which addressed liquifiable soils, artesian groundwater pressures, in a dense urban setting with environmentally sensitive areas.
84 Avenue: Turning 800m of Challenges into Sustainable Solutions
The 84 Ave improvement project posed a myriad of challenges from heavy traffic, environmental concerns, and community engagement, in an effort to achieve Surrey’s sustainable transportation improvement objectives for the next decade.
Rose Valley Water Treatment Plant
The new $75 M Rose Valley WTP provides the City of West Kelowna with potable water. The legacy irrigation district customers were historically burdened by seasonal water quality advisories but now receive fully compliant, safe to consume water.