Collaboration was the guiding principle for BGC, Stantec, Thurber and WSP to work side-by-side to help design and construct one of Canada’s largest pipeline projects, the Trans Mountain Expansion Project resulting in efficiency and innovation.
The Awards for Engineering Excellence demonstrate the value ACEC-BC member firms offer to clients as they celebrate technical excellence and recognize innovation in consulting engineering that is simply a cut above the rest.
LNG Canada Material Offloading Facility
The $96M, 550m long LNG Canada Material Offloading Facility wharf enables Canada’s largest private capital investment project and largest LNG export facility by receiving construction materials and 8,000 tonne plant modules.
5L063 Telkwa Relocation (Bulbous Toe Section) Project
After 7 years of design and construction, the project moved 2.4 km of a radial transmission line out of the path of the Bulbous Toe Landslide to increase reliability and reduce safety risks of a line that serves a large region in northwest BC.
Vancouver Airport Fuel Delivery Project
VAFFC, with RAM acting as the Project Delivery Consultant, completed a new fuel receiving, storage and delivery system for the Vancouver Airport Authority which features a marine terminal, 6 fuel storage tanks, and an underground pipeline to YVR.
Lulu Island Wastewater Treatment Plant Green Hydrogen Production Feasibility Study