The new 1,800-seat stadium at Simon Fraser University is home to the SFU Athletics Team and a new facility for community and student events. The crowning piece of the design is a striking CLT canopy which cantilevers 16 metres, providing weather protection…
The Awards for Engineering Excellence demonstrate the value ACEC-BC member firms offer to clients as they celebrate technical excellence and recognize innovation in consulting engineering that is simply a cut above the rest.
St. Andrew’s Wesley United Church Heritage Conservation & Seismic Upgrade
The Church’s past was considered throughout the project, maintaining its character and fabric where practical while providing a revitalized modern-day structure. The granite and terracotta facades were repaired, restored, and seismically restrained on the exterior…
Fast + Epp Home Office
Fast+Epp’s 4-storey home office building embraces design elegance and curiosity. The building uses hybrid mass timber and steel as the structure’s fundamental building block to demonstrate material efficiency, cost-effectiveness, and sustainable construction. The space on the ground…
Roddan Lodge and Evelyne Saller Centre Redevelopment
The 11-storey redevelopment replaced and expanded housing and services designed and built to current standards. Under the City`s SRO Replacement Bylaw, self-contained studios and one and two-bedroom units replaced Roddan Lodge’s old 156 units. Featuring common….
Canada Games Aquatic Centre Infrastructure Upgrade
In line with the City’s Community Climate Action Plan, this project achieves these sustainability milestones: 36% reduction in Greenhouse Gas Emissions; 21% reduction in total energy use; more robust building envelope; enhanced indoor air quality in the natatorium…
Wii Gyemsiga Siwilaawksat Student Residence
Gyemsiga Siwilaawksat welcomed students in January 2022. The student residence was designed and built in 17 months using a non-traditional construction approach combining modular wood frames and mass timber. The building envelope airtightness…
Royal Columbian Hospital Mental Health and Substance Use Wellness Centre
The new facility provides: A new Energy Centre with centralized heating, cooling, and back-up power generation to serve existing facilities, as well as underground fuel and water storage in an emergency; New Mental Health and Substance Use Wellness…
Williams Lake Net Zero Energy Building
The 1,500m2 MCFD retrofit project in Williams Lake is BC’s first pilot project to trial the design and construction of a ground-breaking Net Zero Energy building. TWD and Energy Revolution Services worked with Thibodeau Architecture + Design and the client to develop…
Highline Metrotown
Horizon Engineering is proud to be a part of the design build team that brought this geotechnically complex and world class development to fruition. Horizon’s collaboration with the project team resulted in innovative geotechnical design solutions which allowed…