Wastewater systems aren’t meant to be seen, heard or smelled. End of life municipal infrastructure in Whistler not only increased maintenance costs and public health risks, it generated unpleasant odours & noise. Upgrades at 3 stations changed that.
BC Cancer Kelowna Linear Accelerator Replacement
A first of its kind in Canada, the new Ethos machine in Kelowna has made a significant impact on cancer treatment with specialized AI. New tech needs new solutions to old problems but the result is more effective treatment and overall patient care.
Lions Gate Bridge Reversible Lane Control System Rehabilitation
60,000 vehicles cross the Lions Gate Bridge each day. Since 1994, a Reversible Lane Control System has helped keep traffic flowing, but required full replacement due to aging technology. PBX developed and implemented a sophisticated high-availability…
Automated Avalanche Detection System
PBX Engineering
Bear Pass is a 62 km stretch of Highway 37A connecting the District of Stewart and Canada’s northernmost ice-free port
with the rest of BC. The corridor is highly susceptible to frequent avalanche activity, causing significant traffic delays due to
highway closures…