The 10-storey Limberlost Place holds the distinction of being Ontario’s first tall timber institutional building, showcasing a harmonious blend of sustainable design, structural innovation, and an advanced refabricated envelope system.
SFU Stadium
The new 1,800-seat stadium at Simon Fraser University is home to the SFU Athletics Team and a new facility for community and student events. The crowning piece of the design is a striking CLT canopy which cantilevers 16 metres, providing weather protection…
BCIT Tall Timber Student Housing
The Tall Timber Student Housing project at the British Columbia Institute of Technology (BCIT) in Burnaby, British Columbia, is a 12-storey structure comprising of 11 mass timber floors over 1 story of concrete to house 470 single occupancy student resident units.
Fast + Epp Home Office
Fast+Epp’s 4-storey home office building embraces design elegance and curiosity. The building uses hybrid mass timber and steel as the structure’s fundamental building block to demonstrate material efficiency, cost-effectiveness, and sustainable construction. The space on the ground…
Tsleil-Waututh Administration and Health Centre
Fast+Epp
The architect developed a captivating wave-like roof design and challenged Fast + Epp to provide a main gathering space free of vertical supports, was aesthetically pleasing, and could maximize the sunlight entering the building. Finally, there was desire from the client…