SNC-Lavalin
The new Champlain Bridge over the St. Lawrence River comprises 2044 m long west approach, a 528 m long cable-stayed section and 762 m long east approach. The Signature on the Saint-Lawrence Group (SSLC)…
The Awards for Engineering Excellence demonstrate the value ACEC-BC member firms offer to clients as they celebrate technical excellence and recognize innovation in consulting engineering that is simply a cut above the rest.
SNC-Lavalin
The new Champlain Bridge over the St. Lawrence River comprises 2044 m long west approach, a 528 m long cable-stayed section and 762 m long east approach. The Signature on the Saint-Lawrence Group (SSLC)…
McElhanney
By the new millennium, the size of modern shipping vessels was only increasing, and the 151ft (46m) clearance height of the Bayonne Bridge became a significant bottleneck to access for the busiest port district on the Eastern Seaboard. The bridge, constructed in 1931, spans the Kill Van Kull strait connecting Staten Island, New York, with Bayonne, New Jersey…
Westmar Advisors
In late December of 2018, a powerful storm swept over British Columbia’s Lower Mainland. The City of White Rock (the City) was particularly hard-hit and suffered extensive damage to its waterfront, including the iconic White Rock Pier…
Binnie
The Alex Fraser Bridge (AFB) is a critical commuter and goods movement road network crossing the Fraser River. With more than 120, 000 vehicles using the bridge daily, congestion was a growing problem, where road users were experiencing excessive delays and queues more than three kilometers long during rush hour…
SNC-Lavalin
As part of the Evergreen Extension completed in 2016, SNC-Lavalin designed and built the existing Vehicle Storage Facility (VSF) in Coquitlam, British Columbia. To assist our client, TransLink, to meet its objectives to address the…
AECOM
From complex structural design to being Canada’s first dual platform transit station, the Commercial-Broadway upgrade project represented a number of engineering firsts for TransLink and a significant investment in Metro Vancouver’s busiest transit hub…
Klohn Crippen Berger
In 2015, Blackbird Infrastructure 407 General Partnership signed a $1.2 billion contract with Infrastructure Ontario to design, build, finance, and maintain the Highway 407 East Phase 2 Project. The project extends Highway 407 to the east approximately 22 kilometres, from Harmony Road in Oshawa to Highway 35/115…
ISL Engineering
The (1.6 km) stretch of the King Boulevard between 64 Avenue and Hall Road near the Newton Town Centre is a significant north/south transportation corridor in the City of Surrey. The six-lane roadway was mainly dominated by car-centric traffic, with little pedestrian accessibility, and limited convenience of transit travel.
WSP
TransLink’s RapidBus program is delivering a package of transit enhancements and customer amenity upgrades that supports bus speed and reliability and an improved experience on TransLink’s busiest bus routes. The RapidBus project consists of more than 60 km of bus priority infrastructure and over 120 upgraded bus stops across 10 communities in the Metro Vancouver region…
Parsons
The Regina Bypass Project was developed to satisfy several strategic objectives, including supporting the sustained population and job growth within Saskatchewan in general, and the Regina area specifically…