Working under the Haisla Nation, Bridgemans Kitimaat Joint Venture and HaiSea Marine designed and constructed a marine base for LNG Canada in Kitmat, BC for dual-fuel escort tugs and the world’s first fully electric harbour tugs.
The Awards for Engineering Excellence demonstrate the value ACEC-BC member firms offer to clients as they celebrate technical excellence and recognize innovation in consulting engineering that is simply a cut above the rest.
The Old Skeena River Bridge: Rehab & Recoating of a 100 Year Old Steel Truss Bridge
Morrison Hershfield provided engineer of record & construction engieering for the historic Old Skeena River Bridge, including full bridge recoating, new bearings, replacement of truss members & 6 sidewalk refuge bays for 30 yrs of additional service.
Highway 1 Malahat Tunnel Hill Washout
The November 2021 extreme rainfall event overwhelmed drainage, resulting in local failure to a wall supporting Highway 1. McElhanney and Thurber mobilized immediately and worked together to restore this crucial highway link on an expedited schedule.
Ross Street Underpass
As a result of Ross Street Underpass, downtown Salmon Arm is now well-connected with its waterfront and is currently benefitting with increased tourism, faster emergency responses, community building, employment opportunities, and economic growth.
The Stack
The Stack, with its distinctive “stacked box” design, is now Vancouver’s tallest office building constructed according to zero carbon standards. It is a unique addition to the downtown Vancouver skyline.
BC Cancer Kelowna Linear Accelerator Replacement
A first of its kind in Canada, the new Ethos machine in Kelowna has made a significant impact on cancer treatment with specialized AI. New tech needs new solutions to old problems but the result is more effective treatment and overall patient care.









