Honoring the Best of Consulting Engineering since 1989.

2025 Awards for

Engineering Excellence

2025 Individual Award Winners

2025 Project Award Nominees & Winners

Water Hazard Detection Program for Railway Flood Monitoring

Water Hazard Detection Program for Railway Flood Monitoring

CPKC’s Water Hazard Detection Program is revolutionizing railway safety and risk management. Using AI and satellite remote sensing data, the system monitors water hazards across 12,600 miles of track, delivering near real-time alerts that improve response times, minimize disruptions, and enable proactive maintenance.

Canada Line – Capstan Station

Canada Line – Capstan Station

Capstan Station, located at the intersection of Capstan Way and No. 3 Road in Richmond, between the existing Bridgeport and Aberdeen stations along the Canada Line, is a critical addition to Metro Vancouver’s TransLink transit system.

Othello Road – Location C

Othello Road – Location C

Recovery from the 2021 Atmospheric River Event in BC provided an opportunity to rethink traditional approaches to mitigating scour and erosion of road embankments adjacent to watercourses, with a focus on integrating environmental benefits into project development life cycles. 

Salton Sea Species Conservation Habitat Project

Salton Sea Species Conservation Habitat Project

The Salton Sea Species Conservation Habitat Project, designed by the Knight Piésold-Kiewit team, revitalized over 4,000 acres of aquatic and terrestrial habitats along the shores of the Salton Sea, a below sea level saltwater lake in California.

Second Narrows Water Supply Tunnel

Second Narrows Water Supply Tunnel

The Second Narrows Water Supply Tunnel project broke ground in early 2019 and the substantial completion milestone was achieved in January 2025. It replaces three of Metro Vancouver’s critical water mains (the Second Narrows Crossing) that convey drinking water…

R6 RapidBus Project – Scott Road Corridor

R6 RapidBus Project – Scott Road Corridor

The R6 RapidBus project runs along Scott Road and 72 Avenue between Scott Road Exchange and Newton Exchange, serving the cities of Surrey and Delta. Launched in January 2024, the R6 RapidBus addresses critical issues….

BCIT Tall Timber Student Housing

BCIT Tall Timber Student Housing

The Tall Timber Student Housing project at the British Columbia Institute of Technology (BCIT) in Burnaby, British Columbia, is a 12-storey structure comprising of 11 mass timber floors over 1 story of concrete to house 470 single occupancy student resident units.

Klamath River Renewal Project

Klamath River Renewal Project

The Klamath River Renewal Project is the largest dam removal and river restoration project in US history, involving the removal of four hydroelectric dams along the Klamath River to restore volitional fish passage to historic spawning grounds.

Highway 97 North Beach Slide

Highway 97 North Beach Slide

On August 28, 2023, a significant rockfall event occurred on Highway 97 between Summerland and Peachland, covering three out of the four travel lanes with approximately 3,000 cubic meters of rock.

Penstock Pressure Relief Ports

Penstock Pressure Relief Ports

BC Hydro sought to improve its ability to respond to a potential abnormal loading condition with high consequences, at one of its hydroelectric facilities. An excessive transient penstock pressure surge following a failure of the generating unit’s pressure…

Chilliwack WWTP Outfall Rehabilitation Project

Chilliwack WWTP Outfall Rehabilitation Project

The City of Chilliwack’s WWTP Engineering Services needed to rehabilitate the WWTP’s effluent outfall pipe and diffuser. In February 2021, a survey revealed 170 meters of pipe had been undermined by scour associated with Fraser River flows.

CəX̣ ʷ Cixʷ Bridge at Falls Creek

CəX̣ ʷ Cixʷ Bridge at Falls Creek

Hwy 1 at Falls Creek was damaged by floods. The Falls Creek Alliance (MOTT, Eurovia/BA Blacktop, Stantec) designed and built a single-span bridge, reopening the Hwy quickly, under budget, ahead of schedule, and with great Indigenous engagement.

Svante’s Centre of Excellence for Carbon Capture & Removal

Svante’s Centre of Excellence for Carbon Capture & Removal

BBA provided complex seismic upgrades to Svante’s Centre of Excellence for Carbon Capture & Removal, Canada’s first commercial-scale facility. Using advanced technologies, BBA reinforced the 141,000 sq. ft. building ensuring safety & sustainability.

Beaver Creek Solar Project

Beaver Creek Solar Project

BBA led the engineering for design, construction and commissioning of the 1.9 MW solar project. The Copper Niisϋϋ Ltd Partnership project reduces diesel use for the off-grid White River First Nation, increases energy sovereignty & economic autonomy.

Capilano Substation Upgrade Project

Capilano Substation Upgrade Project

Capilano Substation (CAP) is an existing 12kV, 56.5MVA substation owned by BC Hydro and located in North Vancouver, with nine feeders and one standby. It was built in 1950 and had been a power supply for years for the North Shore area.

Bonaparte First Nation IR2 Water System Improvements

Bonaparte First Nation IR2 Water System Improvements

The Bonaparte First Nation IR2 Water System Improvements Project is a design and construction project that addressed the significant health and safety risks the existing water systems posed to the residents in the Bonapart First Nation (BFN) I.R.#2 (Lower Hat Creek).

Crab Creek Trail Bridge and Trestle

Crab Creek Trail Bridge and Trestle

V+M’s innovative design addresses various challenges, particularly constructability and environmental restrictions. The result is an economical and aesthetic pair of structures for Washington State Parks that reflect the beauty of the landscape.

Knight Street Bridge Deck Rehabilitation

Knight Street Bridge Deck Rehabilitation

Using a sustainable Polyester Polymer Concrete option for deck overlay replacement, Mott MacDonald helped TransLink make the Knight Street Bridge a safer, more resilient link for everyday commuters and trucks between Vancouver and Richmond.

Burnaby Lake Pavilion Rehabilitation

Burnaby Lake Pavilion Rehabilitation

Nestled in Burnaby Lake Regional Park, the Burnaby Lake Rowing Pavilion is located in an environmentally sensitive habitat that is home to turtles, beavers, ducks, salmon, and other wildlife. The site is a bird sanctuary where blue herons, eagles, kingfishers…

Corra Linn Spillway Gate Replacement Project

Corra Linn Spillway Gate Replacement Project

The Corra Linn Spillway Gate Replacement Project revitalized a 90-year-old spillway on the Kootenay River. Knight Piésold served as the Owner’s Engineer, supporting the development of hydrologic risk management and innovative construction solutions.

Dicklands Farm Biogas Plant

Dicklands Farm Biogas Plant

Dicklands Farm, a well-established dairy farm in Fraser Valley near Chilliwack, BC, has expanded and thrived by integrating innovative technologies and sustainable practices. This approach has improved herd health, boosted efficiency and reduced the farm’s environmental footprint while enhancing long-term productivity.

Rockwell Drive Flood Recovery – Debris Flow Site 1

Rockwell Drive Flood Recovery – Debris Flow Site 1

The Rockwell Drive Flood Recovery project addresses the impacts of the catastrophic “atmospheric river” event in November 2021, which caused widespread washouts and damage along Rockwell Drive. Site DF1, located at 6535 Rockwell Drive…

Fraser Mills Presentation Centre

Fraser Mills Presentation Centre

The Presentation Centre utilizes a forward-thinking mass timber approach that merges structural innovation with an homage to local heritage. Located on a former sawmill site in Coquitlam, the building’s trapezoidal plan spans 200 feet in length…

Nanaimo Correctional Centre

Nanaimo Correctional Centre

The Nanaimo Correctional Centre Replacement project renews the existing facility through innovative, sustainable design, modernizing the complex to house 220 inmates across varied security levels in a campus-like setting.

YVR Pier C CATSA + Conversion Project

YVR Pier C CATSA + Conversion Project

The Vancouver Airport Authority (YVR) upgraded its domestic security screening area with advanced technology to address spatial and logistical challenges. The project introduced the CATSA Plus checkpoint with new Computed Tomography…

Padakus Creek Hydroelectric Project

Padakus Creek Hydroelectric Project

A run-of-river hydro facility on Padakus Creek near Kingcome Inlet, owned by Dzawada’enuxw First Nation, generates 350kW of renewable electricity, displacing 97% of diesel consumption and reducing yearly GHG emissions from ±868MT of CO2 to ±26MT.

Proudly presented by

Stay in touch with us

Subscribe to our mailing list!

Pin It on Pinterest

Share This